Bear Tree Farms - Phase 7
Cattell machine-placed over 6,000 lf of ribbon curb, completing fine grading alongside pouring to reduce project timeframe and minimize site impact.
City of Madison - Lake Street Sewer Pavement Patch
Working with high early strength (HES) concrete, and a specialized crew running on off-peak hours, Cattell completed a ~60 sy pavement patch on the high-traffic intersection of N Lake and University Ave, minimizing downtime and ensuring rapid reopening of the right-of-way.
Village of DeForest - Williamsburg Roundabout
Cattell is completing a roundabout paving project, anticipating nearly 1500 cubic yards of concrete placement between paving, curb and gutter, and pedestrian concrete features. The use of high-performance mixers reduces pour times and results in high-speed placement of flatwork and stormwater features.
City of Madison - Davies & Dempsey Road Reconstruction
Cattell installed over 6000 lf of curb and gutter, in excess of 21,000 sf of concrete flatwork, and pavement features over several months, coordinating with other contractors to minimize impact and cost to the city and local residents.
City of Sun Prairie - Vandenburg, Aspen, & N Bird St Reconstruction
Cattell installed over 6000 lf of curb and gutter, and upwards of 21,000 sf of concrete flatwork, using slipform technology as much as possible to maximize placement speed and minimize cost of sidewalk installation.